Bathroom Project 1
Removed existing tub, installed walk-in shower with grab bars and hand held showerhead. Installed new Dura-ceramic floor, re-plastered the walls, and gave room a new paint job
Removed existing tub, installed walk-in shower with grab bars and hand held showerhead. Installed new Dura-ceramic floor, re-plastered the walls, and gave room a new paint job
Added new cabinet top and medicine cabinet, installed new Dura-ceramic floor, and painted all walls
Installed new tub shower with tile vinyl plank flooring, new vanity, and new cabinet top
We made this bathroom all new with a Sterling Vikrell Tub/shower, Delta faucets, Dura Ceramic flooring, and Wellborn Cabinets